DGP has now completed the enabling works for a section 278 project on behalf of Walker Construction at their Faultlands Farm project in Nuneaton.

Our works on this project included:
• Creating two bellmouths at the site’s entrance and exit
• Removing the existing surface, and replacing with graded granular and type 1 fill material
• Installing new kerb lines

As the construction site entrance was in constant use throughout the day, DGP needed to complete the works at night, and within the appropriate traffic management measures to ensure the road was reusable by the construction plant the following morning.

The exit bellmouth had several services including water, gas, electricity and communications. DGP liaised with the appropriate stakeholders in a timely manner, ensuring they were in attendance for the works while their services were lowered. All works were completed within the agreed timeframe to meet the deadlines that followed, and access to the site was maintained throughout.